Zhengzhou Sanli Building Materials Co., Ltd.
Main products:PVC Formwork,PVC Sawn Timer,Construction Template,Plastic Formwork,Plastic Template
Products
Contact Us
  • Contact Person : Mr. Li Bing
  • Company Name : Zhengzhou Sanli Building Materials Co., Ltd.
  • Tel : 86-371-65982080
  • Fax : 86-371-69086855
  • Address : Henan,Zhengzhou,Room C0077, 3/F, 144 Huayuan Road, Jinshui District
  • Country/Region : China
  • Zip : 450000

New developed plastic slad formwork for concrete

New developed plastic slad formwork for concrete
Product Detailed
1. Easy to be cut, nailed, installed and sawed 2. Easy operate formwork 3. No need for release agent formwork

Advantages of plastic construction formwork for concrete

1. Resist compression

  Plastic steel formwork uses PVC hard material as basis material, and add polymer materials to increase the strength. Per square metre of the plastic template can support more than 5000 kilograms' weight , which can sustain various kinds of building load, therefore, it can totally be substitute for traditional square timber and wooden board.

2. Hardy and Sun Tolerant

   Plastic template replace wood with plastic, hardy and tolerant, plastic template won't be out of shape while execution of work environment is on the temperature condition of -20°C to 60 °C.

3. Fine Brightness and Smoothness

  With no need for release agent,  automatic separation of template will achieved when concrete sets. The gap between templates is very small, after mould uploading,  modular surface is flat and smooth enough to exceed the technical requirements of as-cast finish concrete template.  The gloss finish has exceeded other template, which can promote construction greatly.

4. Recyclable product

  Plastic steel formwork can be recycled more than 30 times, service life is as long as more than 10 years. Our company can recycle, waste plastic template can exchange 30% new template.

5. Moldable sizes

  Plastic steel formwork overall cohesiveness design makes it can be applied in all kinds of girders, columns, cast-in-place roof, shear wall. The size can be changed at will, column form can be used as girder form, girder also can be used as column form; girder form can be used as cast-in-place roof form whereas cast-in-place roof form can be used as girder and column form. 

 

The standard for construction

Allowed deviation  (mm)

 

Seam between two joining formwork

 

Less than 1.5

 

Planar difference between adjacent foemwork

 

Less than 1.5

 

Board-surface smooth of assembled foemwork

 

Less than 1.5

 

Layout linear dimension of assembled formwork

 

Width less than 1.5length blanking controlling

 

Diagonal length differ of assembled formwork

 

0.001blanking controlling when leave factory

 

Wall formwork steel reinforcement dimensions(mm)

Wall thickness

Reinforcementar

rangement

Ledge interval

Rally reinforcement interval

Parallel reinforcement interval

Vertical reinforcement interval

180-200

Yawing

400-500

800-1000

800-1000

400-450

Above200

Yawing

350-400

400-500

400-450

350-400

 

Research and Development 

We have more than 20 engineers in our company, and now we have three factories, which is in Zhengzhou. Kunshan and shanghai. SO we have the power to provided your large supplies.

We invested 10% of our total annual revenue onto Research and Development team. And we believe innovation will keep us on top of construction.

 

Our company supplys pastic steel formwork all the year round, If you are interested in this newly developed recycled plastic template construction, please contact with us with no hesitate! We will never make you disappointed!

 

 

 

New developed plastic slad formwork for concrete



Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.